SEEC have been asked to join an environmental team led by NGH Environmental as the soil conservationists for early works associated with Snowy 2.0. The early works involve re-construction of the existing access road from Cabramurra to Ravine.
SEEC Empowering Teams for Better Water Quality Outcomes
SEEC recently had the pleasure of delivering an erosion and sediment control training course for the team at Laing O’Rourke